Steel

Our Mission Is To Provide Process Automation And Control Systems For The Metals Industries, Whether You Are In The Design, Build, Run Or Optimize Phase Of Your Plant, FTECO Can Help You Determine The Best Investments With The Most Profitable Return Using Standard Methodologies, We Can Help You Define The Scope Of Any Project, Whether It Is An Upgrade To Your Production Line Or An Entire New Plant. Our Engineers Can Design What You Want, Or Be There To Advise Or Supplement Your In-House Staffs.

Jalal Abad Concentrate Dryer

Client: GMI Projects GmbH
C Basis
Project Description:
Developing of Control & Monitoring System Software and Commissioning of ABB Drives.
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Jalal Abad Concentrate Dryer

Client: GMI Projects GmbH
C Basis
Project Description:
Developing of Control & Monitoring System Software and Commissioning of ABB Drives
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Modernization of Rolling Mill Automation System of Faratarh Rolling Co.

Client: Faratarh Rolling Co.
EPC Basis
Project Description:
Engineering Procurement, Installation, and Commissioning of Instrumentation, Automation, Control and Monitoring System in Faratarh Rolling Co. with a capacity of 0.5 million tons per annum
Duration: 8 Months
Starting Year: 2022
Location: Rasht, Iran

0%

Operation of Level 1 Automation System of Zarand Iranian Steel Co.

Client: Zarand Iranian Steel Co.
C Basis
Project Description:
Completion of Unfinished Industrial Automation Level 1 System in All Areas of Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Operation of Level 1 Automation System of Zarand Iranian Steel Co.

Client: Zarand Iranian Steel Co.
C Basis
Project Description:
Completion of Unfinished Industrial Automation Level 1 System in All Areas of Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Modernization of No.300 Rolling Mill of Esfahan Steel Co.

Client: Esfahan Steel Co.
EPC Basis
Project Description:
Design, Procurement, Developing of ABB Drives, Instrumentation, Control & Monitoring System Software, Installation and Commissioning for Modernization of No.300 Rolling Mill of ESCO
Duration: 1 Year
Starting Year: 2022
Location: Esfahan, Iran

0%

Rod line of bar & Rod rolling factory of Arvand Kaveh Steel Co.

Client: Arvand Kaveh Steel Co.
EC Basis
Project Description:
Developing of Control & Monitoring System Software for Rod line of bar & Rod rolling factory with a capacity of 0.6 million Ton/Year in Arvand Kaveh Steel Co. base on PCS7
Duration: 6 Months
Starting Year: 2021
Location: Khorramshahr-Arvand

0%

Rod line of bar & Rod rolling factory of Arvand Kaveh Steel Co.

Client: Arvand Kaveh Steel Co.
EC Basis
Project Description:
Developing of Control & Monitoring System Software for Rod line of bar & Rod rolling factory with a capacity of 0.6 million Ton/Year in Arvand Kaveh Steel Co. base on PCS7
Duration: 6 Months
Starting Year: 2021
Location: Khorramshahr-Arvand

0%

Blast Furnace of Zarand Iranian Steel Complex

Client: Zarand Iranian Steel Complex
EC Basis
Project Description:
Control & Monitoring System Software for Stock House, BF Top, BF Body, Hot Stores, Bag Filter, Slag Granulation, Pump Station, PCI, Pig Casting Machine, Cast House Dedusting and Stock House Dedusting of Blast Furnace
Duration: 3 Months
Starting Year: 2020
Location: Kerman-Zarand

0%

No.150 Furnace of Rolling mill plant of Iran Steel Industrial National Group

Client: Iran Steel Industrial National Group
EPC Basis
Project Description:
Design, Procurement, Developing of Control System, Control & Monitoring System Software, Installation and Commissioning (EIA) for Rolling mill plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz

0%

No.150 Furnace of Rolling mill plant of Iran Steel Industrial National Group

Client: Iran Steel Industrial National Group
EPC Basis
Project Description:
Design, Procurement, Developing of Control System, Control & Monitoring System Software, Installation and Commissioning (EIA) for Rolling mill plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz

0%

Modernization of continues Rolling mill automation system of Iran Alloy steel Co.

Client: Iran Alloy steel company
EPC Basis
Project Description:
Design and Procurement of Control System, Control & Monitoring System Software, Installation and Commissioning (EIA) for Modernization of Rolling mill from S5 to S7 system.
Duration: 9 Months
Starting Year: 2020
Location: Yazd

0%

Concentrate Producing of Sangan

Client: Concentrate factory of Sangan
E Basis
Project Description:
I/O check, preparing Software and Commissioning of Control System for Iron ore concentrate factory of Sangan for two lines with a capacity of 2.5 million Ton/Year. Based on S7-400H Siemens PLCs & PCS7 software.
Duration: 1 Year
Starting Year: 2020
Location: Sangan

0%

Concentrate Producing of Sangan

Client: Concentrate factory of Sangan
E Basis
Project Description:
I/O check, preparing Software and Commissioning of Control System for Iron ore concentrate factory of Sangan for two lines with a capacity of 2.5 million Ton/Year. Based on S7-400H Siemens PLCs & PCS7 software.
Duration: 1 Year
Starting Year: 2020
Location: Sangan

0%

Pelletizing Plant of Bootiaye Iranian Steel Production Factory

Client: Bootiaye Iranian Steel Factory
E Basis
Project Description:
Commissioning of Control, Monitoring & Instrumentation System for Bootiaye Iranian Steel Production Factory, based on S7-400H Siemens PLCs & PCS7 software.
Duration: 1 Year
Starting Year: 2019
Location: Zarand

0%

Rolling mill & Reheating furnace Modernization of Atiyeh Steel Company

EPC Basis
Project Description:
Design and Procurement of Control System, Control & Monitoring System Software, Installation and Commissioning (EIA) for Modernization of Rolling mill & Modernization of Reheating furnace.
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz

0%

Rolling mill & Reheating furnace Modernization of Atiyeh Steel Company

EPC Basis
Project Description:
Design and Procurement of Control System, Control & Monitoring System Software, Installation and Commissioning (EIA) for Modernization of Rolling mill & Modernization of Reheating furnace.
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz

0%

Modernization of No.350 Rolling mill of Esfahan Steel Company

EPC Basis
Project Description:
Design, Procurement, Developing of Drive, Control System, Instrumentation, Control & Monitoring System Software, Installation and Commissioning (EIA) for Modernization of No.350 Rolling mill of ESCO,
Duration: 3 Years
Starting Year: 2015
Location: Esfahan

0%

H1 & H2 units of Mobarakeh Steel CO.

EPC Basis
Project Description:
Design, Procurement, Developing of Control System, Instrumentation, Control & Monitoring System Software, Installation and Commissioning (EIA) for H1 & H2 units of MSC CO., S7-400 and S7-1500 Siemens PLCs & PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan

0%

H1 & H2 units of Mobarakeh Steel CO.

EPC Basis
Project Description:
Design, Procurement, Developing of Control System, Instrumentation, Control & Monitoring System Software, Installation and Commissioning (EIA) for H1 & H2 units of MSC CO., S7-400 and S7-1500 Siemens PLCs & PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan

0%

No. 3 coke Plant in TAVAZON Project of Esfahan Steel Company

EC Basis
Project Description:
Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for No. 3 coke Plant in TAVAZON Project of ESCO, based on S7-400H Siemens PLCs & PCS7 software
Duration: 1 Year
Starting Year: 2013
Location: Esfahan

0%

Bafgh SIntering Plant

C Basis
Project Description:
Design, Developing of Control & Monitoring System Software, Installation and Commissioning of Bafgh Agglomeration based on S7-400H Siemens PLCs & PCS7 software.
Duration: 2 Years
Starting Year: 2013
Location: Bafgh

0%

Bafgh SIntering Plant

C Basis
Project Description:
Design, Developing of Control & Monitoring System Software, Installation and Commissioning of Bafgh Agglomeration based on S7-400H Siemens PLCs & PCS7 software.
Duration: 2 Years
Starting Year: 2013
Location: Bafgh

0%

Bootiaye Iranian Steel Production Factory

C Basis
Project Description:
Commissioning of Control, Monitoring & Instrumentation System for Bootiaye Iranian Steel Production Factory, based on PCS7 Version 8.1 software.
Duration: 6 Months
Starting Year: 2017
Location: Kerman

0%

Hormozgan Steel Making CO.

C Basis
Project Description: Commissioning of Control, Monitoring & Instrumentation System for Hormozgan Steel making CO., based on S7-400H Siemens PLCs & PCS7 software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) *(Approx. I/O No.: 5000, Capacity: 1,500,000 ton/year)
Duration: 6 Months
Starting Year: 2010
Location: Hormozgan

0%

Hormozgan Steel Making CO.

C Basis
Project Description: Commissioning of Control, Monitoring & Instrumentation System for Hormozgan Steel making CO., based on S7-400H Siemens PLCs & PCS7 software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) *(Approx. I/O No.: 5000, Capacity: 1,500,000 ton/year)
Duration: 6 Months
Starting Year: 2010
Location: Hormozgan

0%

Machine Positioning of No. 3 coke Plant of Esfahan Steel Company

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Machine Positioning of No. 3 coke Plant in TAVAZON Project of ESCO including:
– Coke Pusher Machine
– Quenching Machine
– Transfer Machine
– Charging Car
based on S7-400H Siemens PLCs & PCS7 software (Approx. I/O No.: 1200, Capacity: 900,000 ton/year)
Duration: 2 Years
Starting Year: 2014
Location: Esfahan

0%

Modernization of Galvanized Coil and Sheet unit of Amirkabir Steel Co.

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for SSL unit of Amirkabir Steel Co.
Duration: 6 Months
Starting Year: 2016
Location: Kashan, Esfahan

0%

Modernization of Galvanized Coil and Sheet unit of Amirkabir Steel Co.

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for SSL unit of Amirkabir Steel Co.
Duration: 6 Months
Starting Year: 2016
Location: Kashan, Esfahan

0%

Modernization of Material Storage, Stacker & Reclaimer of Esfahan Steel Co

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Modernization and Expansion of Raw Material Storage and Stacker & Reclaimer Machines of ESCO, one of the biggest in the middle east material handling project
Duration: 3 Years
Starting Year: 2011
Location: Esfahan

0%

Raw Material Handling of ESCO

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Raw Material Handling of Esfahan Steel Company.
Duration: 3 Years
Starting Year: 2011
Location: Esfahan

0%

Raw Material Handling of ESCO

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Raw Material Handling of Esfahan Steel Company.
Duration: 3 Years
Starting Year: 2011
Location: Esfahan

0%

Melt Shop Plant of ESCO

E Basis
Project Description:
Upgrading and modifying Software from PCS7 Version 5.2 to PCS7 Version 7.1 .
Duration: 18 Months
Starting Year: 2012
Location: Esfahan

0%

Low hydrogen annealing of Mobarakeh Steel Company

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Low hydrogen annealing of Mobarakeh Steel Company based on Siemens PLCs & PCS7 software *(Approx. I/O No.: 2000)
Duration: 18 Months
Starting Year: 2015
Location: Esfahan

0%

Low hydrogen annealing of Mobarakeh Steel Company

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Low hydrogen annealing of Mobarakeh Steel Company based on Siemens PLCs & PCS7 software *(Approx. I/O No.: 2000)
Duration: 18 Months
Starting Year: 2015
Location: Esfahan

0%

Heat Up Procedure of No.1 Battery in Esfahan Steel Company

EC Basis
Project Description:
Design & Developing of Monitoring System Software for Heat Up Procedure of No.1 Battery in ESCO, based on ADAM Modules & WINCC HMI software (Approx. Thermocouple No.: 400)
Duration: 6 Months
Starting Year: 2014
Location: Esfahan

0%

About US

Faratarh Engineering Company (FTECO.) started it’s activities in early 2008, in the Industrial Automation, Instrumentation and Process Control fields…

Social Network

  • Mail

Contact US

Add:No.23, 99 Building, (Mosque Al reza) alley, Chaharbagh Bala Street, Esfahan, Iran
Tel :031-36640017
Fax :031-36640018
Email :info@faratarh.net

Latest Projects

  • Powerآوریل 30, 2015 - 5:09 ب.ظ
  • Petrochemicalمی 21, 2014 - 3:36 ب.ظ
  • water & waste waterژانویه 21, 2013 - 3:43 ب.ظ
Faratarh.net - Copyright © 2022 - All rights reserved. - Enfold WordPress Theme by Kriesi
Oil & Gas water & waste water
رفتن به بالا