Our Mission Is To Provide Process Automation And Control Systems For The Metals Industries, Whether You Are In The Design, Build, Run Or Optimize Phase Of Your Plant, FTECO Can Help You Determine The Best Investments With The Most Profitable Return Using Standard Methodologies, We Can Help You Define The Scope Of Any Project, Whether It Is An Upgrade To Your Production Line Or An Entire New Plant. Our Engineers Can Design What You Want, Or Be There To Advise Or Supplement Your In-House Staffs.
C Basis
Client: GMI Projects GmbH
Project Description:
Development of Control & Monitoring System Software and Commissioning of ABB Drives.
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran
C Basis
Client: GMI Projects GmbH
Project Description:
Development of Control & Monitoring System Software and Commissioning of ABB Drives.
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran
EPC Basis
Client: Faratarh Rolling Co.
Project Description:
Engineering Procurement, Installation, and Commissioning of Instrumentation, Automation, Control and Monitoring System in Faratarh Rolling Co. with a capacity of 0.5 million tons per annum
Duration: 8 Months
Starting Year: 2022
Location: Rasht, Iran
C Basis
Client: Zarand Iranian Steel Co.
Project Description:
Completion of the Level 1 Industrial Automation System in all areas of the Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran
C Basis
Client: Zarand Iranian Steel Co.
Project Description:
Completion of the Level 1 Industrial Automation System in all areas of the Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran
EPC Basis
Client: Esfahan Steel Co.
Project Description:
Design, Procurement, Development of ABB Drives, Instrumentation, Control, and Monitoring System Software, Installation, and Commissioning for the Modernization of the No. 300 Rolling Mill at ESCO
Duration: 1 Year
Starting Year: 2022
Location: Esfahan, Iran
EC Basis
Client: Arvand Kaveh Steel Co.
Project Description:
Development of Control and Monitoring System Software for the Rod Line of the Bar and Rod Rolling Factory with a capacity of 0.6 million tons per year at Arvand Kaveh Steel Co., based on PCS7
Duration: 3 months
Starting Year: 2021
Location: Khorramshahr, Iran
EC Basis
Client: Arvand Kaveh Steel Co.
Project Description:
Development of Control and Monitoring System Software for the Rod Line of the Bar and Rod Rolling Factory with a capacity of 0.6 million tons per year at Arvand Kaveh Steel Co., based on PCS7
Duration: 3 months
Starting Year: 2021
Location: Khorramshahr, Iran
Client: Zarand Iranian Steel Complex
EC Basis
Project Description:
Control & Monitoring System Software for Stock House, BF Top, BF Body, Hot Stores, Bag Filter, Slag Granulation, Pump Station, PCI, Pig Casting Machine, Cast House Dedusting and Stock House Dedusting of Blast Furnace
Duration: 3 Months
Starting Year: 2020
Location: Kerman-Zarand
EPC Basis
Client: Iran Steel Industrial National Group
Project Description:
Design, Procurement, Development of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Rolling Mill Plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz, Iran
EPC Basis
Client: Iran Steel Industrial National Group
Project Description:
Design, Procurement, Development of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Rolling Mill Plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz, Iran
EPC Basis
Client: Iran Alloy steel company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill from S5 to S7 System
Duration: 9 months
Starting Year: 2020
Location: Yazd, Iran
C Basis
Client: Concentrate factory of Sangan
Project Description:
I/O Check, Software Development, and Commissioning of the Control System for the Iron Ore Concentrate Factory at Sangan, featuring two lines with a capacity of 2.5 million tons per year, based on S7-400H Siemens PLCs and PCS7 software
Duration: 1 Year
Starting Year: 2020
Location: Sangan, Iran
C Basis
Client: Concentrate factory of Sangan
Project Description:
I/O Check, Software Development, and Commissioning of the Control System for the Iron Ore Concentrate Factory at Sangan, featuring two lines with a capacity of 2.5 million tons per year, based on S7-400H Siemens PLCs and PCS7 software
Duration: 1 Year
Starting Year: 2020
Location: Sangan, Iran
E Basis
Client: Butia Iranian Steel Company
Project Description:
Commissioning of Control, Monitoring & Instrumentation System for Butia Iranian Steel Company, based on S7-400H Siemens PLCs & PCS7 software
Duration: 1 Year
Starting Year: 2019
Location: Zarand, Iran
EPC Basis
Client: Atiyeh Steel Company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill and Reheating Furnace
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz, Iran
EPC Basis
Client: Atiyeh Steel Company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill and Reheating Furnace
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz
EPC Basis
Client: Esfahan Steel Co.
Project Description:
Design, Procurement, Development of Drive, Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the No. 350 Rolling Mill at Esfahan Steel Company
Duration: 3 years
Starting Year: 2015
Location: Esfahan, Iran
EPC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for H1 and H2 Units of Mobarakeh Steel Company, utilizing S7-400 and S7-1500 Siemens PLCs and PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan, Iran
EPC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for H1 and H2 Units of Mobarakeh Steel Company, utilizing S7-400 and S7-1500 Siemens PLCs and PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan, Iran
EC Basis
Project Description:
Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for No. 3 coke Plant in TAVAZON Project of ESCO, based on S7-400H Siemens PLCs & PCS7 software
Duration: 1 Year
Starting Year: 2013
Location: Esfahan
C Basis
Client: Iran Central Iron Ore Compan
Project Description:
Design, Development of Control and Monitoring System Software, Installation, and Commissioning of Bafgh Agglomeration Based on S7-400H Siemens PLCs and PCS7 V8.0 Software (Approx. I/O No. : 4700)
Capacity: 800,000 tons per annum
Duration: 6 months
Starting Year: 2013
Location: Bafgh, Yazd, Iran
C Basis
Client: Iran Central Iron Ore Compan
Project Description:
Design, Development of Control and Monitoring System Software, Installation, and Commissioning of Bafgh Agglomeration Based on S7-400H Siemens PLCs and PCS7 V8.0 Software (Approx. I/O No. : 4700)
Capacity: 800,000 tons per annum
Duration: 6 months
Starting Year: 2013
Location: Bafgh, Yazd, Iran
C Basis
Client: Butia Iranian Steel Company
Project Description:
Commissioning of Control, Monitoring, and Instrumentation System for Butia Iranian Steel Production Factory, based on PCS7 Version 8.1 Software
Duration: 6 Months
Starting Year: 2017
Location: Kerman, Iran
C Basis
Client: Iritech Company
Project Description: Commissioning of Control, Monitoring, and Instrumentation System for Hormozgan Steel Company, based on S7-400H Siemens PLCs and PCS7 Software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) (Approx. I/O Number: 5,000, Capacity: 1,500,000 tons/year)
Duration: 1 year
Starting Year: 2011
Location: Hormozgan, Iran
C Basis
Client: Iritech Company
Project Description: Commissioning of Control, Monitoring, and Instrumentation System for Hormozgan Steel Company, based on S7-400H Siemens PLCs and PCS7 Software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) (Approx. I/O Number: 5,000, Capacity: 1,500,000 tons/year)
Duration: 1 year
Starting Year: 2011
Location: Hormozgan, Iran
EPC Basis
Client: Esfahan Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Machine Positioning of No. 3 Coke Plant in the TAVAZON Project of Esfahan Steel Company, including:
– Coke Pusher Machine
– Quenching Machine
– Transfer Machine
– Charging Car
Based on S7-400H Siemens PLCs and PCS7 Software (Approx. I/O Number: 1,200, Capacity: 900,000 tons/year)
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran
EPC Basis
Client: Kashan Amirkabir Steel Co.
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System for the SSL Unit of Amirkabir Steel Company
Duration: 6 Months
Starting Year: 2019
Location: Kashan, Esfahan, Iran
EPC Basis
Client: Kashan Amirkabir Steel Co.
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System for the SSL Unit of Amirkabir Steel Company
Duration: 6 Months
Starting Year: 2019
Location: Kashan, Esfahan, Iran
EPC Basis
Client: Esfahan Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for the Modernization and Expansion of Raw Material Storage and Stacker & Reclaimer Machines of Esfahan Steel Company, one of the largest material handling projects in the Middle East
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran
EC Basis
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Raw Material Handling at Esfahan Steel Company
Duration: 1 Year
Starting Year: 2011
Location: Esfahan, Iran
EC Basis
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Raw Material Handling at Esfahan Steel Company
Duration: 1 Year
Starting Year: 2011
Location: Esfahan, Iran
E Basis
Client: Esfahan Steel Company
Project Description:
Upgrading and modifying Software from PCS7 Version 5.2 to PCS7 Version 7.1
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran
EC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Low Hydrogen Annealing for Mobarakeh Steel Company, based on Siemens PLCs and PCS7 Software (Approx. I/O Number: 2,000)
Duration: 8 Months
Starting Year: 2014
Location: Esfahan, Iran
EC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Low Hydrogen Annealing for Mobarakeh Steel Company, based on Siemens PLCs and PCS7 Software (Approx. I/O Number: 2,000)
Duration: 8 Months
Starting Year: 2014
Location: Esfahan, Iran
EC Basis
Client: Esfahan Steel Company
Project Description:
Design and Development of Monitoring System Software for the Heat Up Procedure of No. 1 Battery at Esfahan Steel Company, based on ADAM Modules and WinCC HMI Software (Approx. Number of Thermocouples: 400)
Duration: 6 Months
Starting Year: 2014
Location: Esfahan, Iran