Faratarh Co-FTECO
  • فارسی
  • Legal Info
  • Contact Us
  • About Us
    • Abilities
    • organization
    • Certificates
    • approvals
  • Projects
    • water & waste water
    • Steel
    • Oil & Gas
    • Power
    • Petrochemical
  • Home
  • منو منو
  • Home
  • Projects
    • water & waste water
    • Steel
    • Oil & Gas
    • Power
    • Petrochemical
  • About Us
    • Abilities
    • organization
    • Certificates
    • approvals
  • Contact us
  • Legal Info
  • فارسی

Steel

Our Mission Is To Provide Process Automation And Control Systems For The Metals Industries, Whether You Are In The Design, Build, Run Or Optimize Phase Of Your Plant, FTECO Can Help You Determine The Best Investments With The Most Profitable Return Using Standard Methodologies, We Can Help You Define The Scope Of Any Project, Whether It Is An Upgrade To Your Production Line Or An Entire New Plant. Our Engineers Can Design What You Want, Or Be There To Advise Or Supplement Your In-House Staffs.

Jalal Abad Concentrate Dryer

C Basis
Client: GMI Projects GmbH
Project Description:
Development of Control & Monitoring System Software and Commissioning of ABB Drives.
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Jalal Abad Concentrate Dryer

C Basis
Client: GMI Projects GmbH
Project Description:
Development of Control & Monitoring System Software and Commissioning of ABB Drives.
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Modernization of Rolling Mill Automation System of Faratarh Rolling Co.

EPC Basis
Client: Faratarh Rolling Co.
Project Description:
Engineering Procurement, Installation, and Commissioning of Instrumentation, Automation, Control and Monitoring System in Faratarh Rolling Co. with a capacity of 0.5 million tons per annum
Duration: 8 Months
Starting Year: 2022
Location: Rasht, Iran

0%

Level 1 Automation System of Zarand Iranian Steel Co.

C Basis
Client: Zarand Iranian Steel Co.
Project Description:
Completion of the Level 1 Industrial Automation System in all areas of the Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Level 1 Automation System of Zarand Iranian Steel Co.

C Basis
Client: Zarand Iranian Steel Co.
Project Description:
Completion of the Level 1 Industrial Automation System in all areas of the Zarand Steel Complex with a capacity of 1.7 million tons per annum
Duration: 3 Months
Starting Year: 2022
Location: Zarand, Iran

0%

Modernization of the No. 300 Rolling Mill at Esfahan Steel Company

EPC Basis
Client: Esfahan Steel Co.
Project Description:
Design, Procurement, Development of ABB Drives, Instrumentation, Control, and Monitoring System Software, Installation, and Commissioning for the Modernization of the No. 300 Rolling Mill at ESCO
Duration: 1 Year
Starting Year: 2022
Location: Esfahan, Iran

0%

Rod line of bar & Rod rolling factory of Arvand Kaveh Steel Co.

EC Basis
Client: Arvand Kaveh Steel Co.
Project Description:
Development of Control and Monitoring System Software for the Rod Line of the Bar and Rod Rolling Factory with a capacity of 0.6 million tons per year at Arvand Kaveh Steel Co., based on PCS7
Duration: 3 months
Starting Year: 2021
Location: Khorramshahr, Iran

0%

Rod line of bar & Rod rolling factory of Arvand Kaveh Steel Co.

EC Basis
Client: Arvand Kaveh Steel Co.
Project Description:
Development of Control and Monitoring System Software for the Rod Line of the Bar and Rod Rolling Factory with a capacity of 0.6 million tons per year at Arvand Kaveh Steel Co., based on PCS7
Duration: 3 months
Starting Year: 2021
Location: Khorramshahr, Iran

0%

Blast Furnace of Zarand Iranian Steel Complex

Client: Zarand Iranian Steel Complex
EC Basis
Project Description:
Control & Monitoring System Software for Stock House, BF Top, BF Body, Hot Stores, Bag Filter, Slag Granulation, Pump Station, PCI, Pig Casting Machine, Cast House Dedusting and Stock House Dedusting of Blast Furnace
Duration: 3 Months
Starting Year: 2020
Location: Kerman-Zarand

0%

No. 150 Furnace of the Rolling Mill Plant of Iran Steel Industrial National Group

EPC Basis
Client: Iran Steel Industrial National Group
Project Description:
Design, Procurement, Development of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Rolling Mill Plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz, Iran

0%

No. 150 Furnace of the Rolling Mill Plant of Iran Steel Industrial National Group

EPC Basis
Client: Iran Steel Industrial National Group
Project Description:
Design, Procurement, Development of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Rolling Mill Plant of Iran Steel Industrial National Group
Duration: 9 Months
Starting Year: 2020
Location: Ahvaz, Iran

0%

Modernization of the Continuous Rolling Mill Automation System of Iran Alloy Steel Co.

EPC Basis
Client: Iran Alloy steel company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill from S5 to S7 System
Duration: 9 months
Starting Year: 2020
Location: Yazd, Iran

0%

Concentrate Producing of Sangan

C Basis
Client: Concentrate factory of Sangan
Project Description:
I/O Check, Software Development, and Commissioning of the Control System for the Iron Ore Concentrate Factory at Sangan, featuring two lines with a capacity of 2.5 million tons per year, based on S7-400H Siemens PLCs and PCS7 software
Duration: 1 Year
Starting Year: 2020
Location: Sangan, Iran

0%

Concentrate Producing of Sangan

C Basis
Client: Concentrate factory of Sangan
Project Description:
I/O Check, Software Development, and Commissioning of the Control System for the Iron Ore Concentrate Factory at Sangan, featuring two lines with a capacity of 2.5 million tons per year, based on S7-400H Siemens PLCs and PCS7 software
Duration: 1 Year
Starting Year: 2020
Location: Sangan, Iran

0%

Pelletizing Plant of Butia Iranian Steel Company

E Basis
Client: Butia Iranian Steel Company
Project Description:
Commissioning of Control, Monitoring & Instrumentation System for Butia Iranian Steel Company, based on S7-400H Siemens PLCs & PCS7 software
Duration: 1 Year
Starting Year: 2019
Location: Zarand, Iran

0%

Modernization of the Rolling Mill and Reheating Furnace at Atiyeh Steel Company

EPC Basis
Client: Atiyeh Steel Company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill and Reheating Furnace
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz, Iran

0%

Modernization of the Rolling Mill and Reheating Furnace at Atiyeh Steel Company

EPC Basis
Client: Atiyeh Steel Company
Project Description:
Design and Procurement of Control Systems, Control and Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the Rolling Mill and Reheating Furnace
Duration: 9 Months
Starting Year: 2019
Location: Ahvaz

0%

Modernization of the No. 350 Rolling Mill at Esfahan Steel Company

EPC Basis
Client: Esfahan Steel Co.
Project Description:
Design, Procurement, Development of Drive, Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for the Modernization of the No. 350 Rolling Mill at Esfahan Steel Company
Duration: 3 years
Starting Year: 2015
Location: Esfahan, Iran

0%

H1 and H2 Units of Mobarakeh Steel Company

EPC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for H1 and H2 Units of Mobarakeh Steel Company, utilizing S7-400 and S7-1500 Siemens PLCs and PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan, Iran

0%

H1 and H2 Units of Mobarakeh Steel Company

EPC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control System, Instrumentation, Control & Monitoring System Software, Installation, and Commissioning (EIA) for H1 and H2 Units of Mobarakeh Steel Company, utilizing S7-400 and S7-1500 Siemens PLCs and PCS7
Duration: 1 Year
Starting Year: 2018
Location: Esfahan, Iran

0%

No. 3 coke Plant in TAVAZON Project of Esfahan Steel Company

EC Basis
Project Description:
Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for No. 3 coke Plant in TAVAZON Project of ESCO, based on S7-400H Siemens PLCs & PCS7 software
Duration: 1 Year
Starting Year: 2013
Location: Esfahan

0%

Bafgh Sintering Plant

C Basis
Client: Iran Central Iron Ore Compan
Project Description:
Design, Development of Control and Monitoring System Software, Installation, and Commissioning of Bafgh Agglomeration Based on S7-400H Siemens PLCs and PCS7 V8.0 Software (Approx. I/O No. : 4700)
Capacity: 800,000 tons per annum
Duration: 6 months
Starting Year: 2013
Location: Bafgh, Yazd, Iran

0%

Bafgh Sintering Plant

C Basis
Client: Iran Central Iron Ore Compan
Project Description:
Design, Development of Control and Monitoring System Software, Installation, and Commissioning of Bafgh Agglomeration Based on S7-400H Siemens PLCs and PCS7 V8.0 Software (Approx. I/O No. : 4700)
Capacity: 800,000 tons per annum
Duration: 6 months
Starting Year: 2013
Location: Bafgh, Yazd, Iran

0%

Butia Iranian Steel Production Factory

C Basis
Client: Butia Iranian Steel Company
Project Description:
Commissioning of Control, Monitoring, and Instrumentation System for Butia Iranian Steel Production Factory, based on PCS7 Version 8.1 Software
Duration: 6 Months
Starting Year: 2017
Location: Kerman, Iran

0%

Hormozgan Steel Company

C Basis
Client: Iritech Company
Project Description: Commissioning of Control, Monitoring, and Instrumentation System for Hormozgan Steel Company, based on S7-400H Siemens PLCs and PCS7 Software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) (Approx. I/O Number: 5,000, Capacity: 1,500,000 tons/year)
Duration: 1 year
Starting Year: 2011
Location: Hormozgan, Iran

0%

Hormozgan Steel Company

C Basis
Client: Iritech Company
Project Description: Commissioning of Control, Monitoring, and Instrumentation System for Hormozgan Steel Company, based on S7-400H Siemens PLCs and PCS7 Software, jointly with ANSALDO (Italy) and SMS-DEMAG (Germany) (Approx. I/O Number: 5,000, Capacity: 1,500,000 tons/year)
Duration: 1 year
Starting Year: 2011
Location: Hormozgan, Iran

0%

Machine Positioning of No. 3 coke Plant of Esfahan Steel Company

EPC Basis
Client: Esfahan Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Machine Positioning of No. 3 Coke Plant in the TAVAZON Project of Esfahan Steel Company, including:
– Coke Pusher Machine
– Quenching Machine
– Transfer Machine
– Charging Car
Based on S7-400H Siemens PLCs and PCS7 Software (Approx. I/O Number: 1,200, Capacity: 900,000 tons/year)
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran

0%

Modernization of Galvanized Coil and Sheet unit of Amirkabir Steel Co.

EPC Basis
Client: Kashan Amirkabir Steel Co.
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System for the SSL Unit of Amirkabir Steel Company
Duration: 6 Months
Starting Year: 2019
Location: Kashan, Esfahan, Iran

0%

Modernization of Galvanized Coil and Sheet unit of Amirkabir Steel Co.

EPC Basis
Client: Kashan Amirkabir Steel Co.
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System for the SSL Unit of Amirkabir Steel Company
Duration: 6 Months
Starting Year: 2019
Location: Kashan, Esfahan, Iran

0%

Modernization of Material Storage, Stacker & Reclaimer of Esfahan Steel Co

EPC Basis
Client: Esfahan Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for the Modernization and Expansion of Raw Material Storage and Stacker & Reclaimer Machines of Esfahan Steel Company, one of the largest material handling projects in the Middle East
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran

0%

Raw Material Handling at Esfahan Steel Company

EC Basis
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Raw Material Handling at Esfahan Steel Company
Duration: 1 Year
Starting Year: 2011
Location: Esfahan, Iran

0%

Raw Material Handling at Esfahan Steel Company

EC Basis
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Control System (EIA) for Raw Material Handling at Esfahan Steel Company
Duration: 1 Year
Starting Year: 2011
Location: Esfahan, Iran

0%

Melt Shop Plant of ESCO

E Basis
Client: Esfahan Steel Company
Project Description:
Upgrading and modifying Software from PCS7 Version 5.2 to PCS7 Version 7.1
Duration: 6 months
Starting Year: 2013
Location: Esfahan, Iran

0%

Low Hydrogen Annealing at Mobarakeh Steel Company

EC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Low Hydrogen Annealing for Mobarakeh Steel Company, based on Siemens PLCs and PCS7 Software (Approx. I/O Number: 2,000)
Duration: 8 Months
Starting Year: 2014
Location: Esfahan, Iran

0%

Low Hydrogen Annealing at Mobarakeh Steel Company

EC Basis
Client: Mobarakeh Steel Company
Project Description:
Design, Procurement, Development of Control and Monitoring System Software, Installation, and Commissioning of Low Hydrogen Annealing for Mobarakeh Steel Company, based on Siemens PLCs and PCS7 Software (Approx. I/O Number: 2,000)
Duration: 8 Months
Starting Year: 2014
Location: Esfahan, Iran

0%

Heat Up Procedure of No.1 Battery in Esfahan Steel Company

EC Basis
Client: Esfahan Steel Company
Project Description:
Design and Development of Monitoring System Software for the Heat Up Procedure of No. 1 Battery at Esfahan Steel Company, based on ADAM Modules and WinCC HMI Software (Approx. Number of Thermocouples: 400)
Duration: 6 Months
Starting Year: 2014
Location: Esfahan, Iran

0%

About US

Faratarh Engineering Company (FTECO.) started it’s activities in early 2008, in the Industrial Automation, Instrumentation and Process Control fields…

Social Network

  • Mail
  • LinkedIn

Contact US

:Main Office
Address : S11-2, 11th Floor, IFC Tower, Isfahan City Center
Tel. & Fax  : +98-3191093881
:Canada Office
Address: 43 Augusta Court Thornhill ON L3T 7K5
Canada
Tel.: +1(647)470-1330

Email: info@faratarh.net

Latest Projects

  • Powerآوریل 30, 2015 - 5:09 ب.ظ
  • Petrochemicalمی 21, 2014 - 3:36 ب.ظ
  • water & waste waterژانویه 21, 2013 - 3:43 ب.ظ
Faratarh.net - Copyright © 2022 - All rights reserved. - Enfold WordPress Theme by Kriesi
Oil & Gas water & waste water
رفتن به بالا