Water & Waste Water

We Offer Our Technology & Solution In The Field Of Water Treatment Plants. The Reliability Of Our Solutions Helps Guarantee Maximum Process Availability. Our Attention To Reliability And Quality As Well As Our Long Experience As An Industrial Supplier Make Us The Ideal Partner Both For New Build And Modernization Projects. The Flexibility Of Our Solutions Provides You The Possibility To Chart Your Factory’s Future Growth Strategy. Electrical / Automation Erection Supervision And Commissioning In Different Factories Are Some Of Our Experiences In This Field.

Commissioning the control and automation system for the water supply unit at Zarand Steel Complex

C Basis
Client: Ghaem Reza Industries Complex
Project Description:
Production of purified water for the production process of steel ingots at Zarand Steel Complex
Duration : 3 months
Starting Year : 2020
Location : Zarand, Iran

0%

Secondary Reverse Osmosis Wastewater Treatment of Mobarakeh Steel Complex.

EPC Basis
Client: Ghaem Reza Industries Complex
Project Description:
Procurement, programming, and commissioning of the automation system, and manufacturing of PLC and RIO panels with a capacity of 900 cubic meters per hour
Duration: 2 months
Starting Year: 2022
Location: Mobarakeh, Iran

0%

Secondary Reverse Osmosis Wastewater Treatment of Mobarakeh Steel Complex.

EPC Basis
Client: Ghaem Reza Industries Complex
Project Description:
Procurement, programming, and commissioning of the automation system, and manufacturing of PLC and RIO panels with a capacity of 900 cubic meters per hour
Duration: 2 months
Starting Year: 2022
Location: Mobarakeh, Iran

0%

Abadan Water Treatment Plant

EPC Basis
Client: Abadan Province Water & Wastewater Company
Project Description:
Design, procurement, developing of control & monitoring system software, installation and commissioning of control system (EIA) for the Abadan water treatment plant, based on S7-400 Siemens PLCs & S7 & WinCC software
Capacity: 180000 m3/24h *(Approx. I/O No.: 2500)
Duration : 2 Years
Starting Year : 2009
Location : Abadan

0%

Control System for No. 5&6 module of Tehran Sewerage Treatment Plant

EPC Basis
Client: Tehran Province Water & Wastewater Company
Project Description:
Design, procurement, developing of control & monitoring system software, installation and commissioning of control system (EIA) for No. 5&6 module of Tehran sewerage treatment plant, based on S7-400 Siemens PLCs & S7 & WinCC software Capacity: 1050000 m3/24h *(Approx. I/O No.: 5500)
Duration: 18 months
Starting Year: 2010
Location: Tehran

0%

Control System for No. 5&6 module of Tehran Sewerage Treatment Plant

EPC Basis
Client: Tehran Province Water & Wastewater Company
Project Description:
Design, procurement, developing of control & monitoring system software, installation and commissioning of control system (EIA) for No. 5&6 module of Tehran sewerage treatment plant, based on S7-400 Siemens PLCs & S7 & WINCC software Capacity: 1050000 m3/24h *(Approx. I/O No.: 5500)
Duration: 18 months
Starting Year: 2010
Location: Tehran

0%

Control System (EIA) for controlling gates of Zayanderood Dam

EPC Basis
Client: Isfahan Regional Water
:Project Description
Design, procurement, developing of control & monitoring system software, installation and commissioning of control system (EIA) for controlling gates of Zayanderood Dam based on S7-1200 redundancy and TIA software *(Approx. I/O No.: 2500)
Duration: 6 months
Starting Year: 2014
Location: Esfahan

0%

Control System (EIA) for water supply plant for Mobarakeh City and suburb towns

EPC Basis
.Client: Ark Beton Co
:Project Description
Design, procurement, development of control and monitoring system software, installation, and commissioning of the control system based on S7-300 and WinCC, along with the commissioning of ABB inverters
Duration: 6 months
Starting Year: 2010
Location: Esfahan

0%

Control System (EIA) for water supply plant for Mobarakeh City and suburb towns

EPC Basis
.Client: Ark Beton Co
:Project Description
Design, procurement, development of control and monitoring system software, installation, and commissioning of the control system based on S7-300 and WinCC, along with the commissioning of ABB inverters
Duration: 6 months
Starting Year: 2010
Location: Esfahan

0%

Automation System for the Water Pump Stations Plant in Chabahar

EPC Basis
Client: Zharf Kar Jam Co.
Project Description:
Software Engineering and Commissioning of the Automation System for the Pump Stations Plant in Chabahar, utilizing the S7 Series of Siemens PLCs (S-400) and WINCC Software, along with the fabrication of PLC and Remote I/O panels.
Duration: 1 Year
Starting Year: 2009
Location: Chabahar

0%

Physical & Chemical Water Treatment Plant of Esfahan Steel Company

EPC Basis
Client: ESCO.
Project Description:
Design, procurement, and development of control and monitoring system software, installation, and commissioning of the control system (EIA) for the modernization and extension of the physical and chemical water treatment plant of ESCO, based on S7-300 Siemens PLCs and S7 & WinCC software (Approx. I/O No.: 2500)
Duration: 2 years
Starting Year: 2009
Location: Esfahan

0%

Physical & Chemical Water Treatment Plant of Esfahan Steel Company

EPC Basis
Client: ESCO.
Project Description:
Design, procurement, and development of control and monitoring system software, installation, and commissioning of the control system (EIA) for the modernization and extension of the physical and chemical water treatment plant of ESCO, based on S7-300 Siemens PLCs and S7 & WinCC software (Approx. I/O No.: 2500)
Duration: 2 years
Starting Year: 2009
Location: Esfahan

0%

Water Supply Plant for the Blast Furnace of Esfahan Steel Company

EPC Basis
Client: Control Volt Co.
Project Description:
Software engineering and commissioning of the automation system for the water supply plant for the blast furnace of Esfahan Steel company, utilizing the S7 series of Siemens PLCs (S-300) and WinCC software, along with the fabrication of PLC and Remote I/O panels
Duration:1 year
Starting Year: 2010
Location: Esfahan

0%

About US

Faratarh Engineering Company (FTECO.) started it’s activities in early 2008, in the Industrial Automation, Instrumentation and Process Control fields…

Social Network

  • Mail
  • LinkedIn

Contact US

:Main Office
Address : S11-2, 11th Floor, IFC Tower, Isfahan City Center
Tel. & Fax  : +98-3191093881
:Canada Office
Address: 43 Augusta Court Thornhill ON L3T 7K5
Canada
Tel.: +1(647)470-1330

Email: info@faratarh.net

Latest Projects

  • Powerآوریل 30, 2015 - 5:09 ب.ظ
  • Petrochemicalمی 21, 2014 - 3:36 ب.ظ
  • water & waste waterژانویه 21, 2013 - 3:43 ب.ظ
Faratarh.net - Copyright © 2022 - All rights reserved. - Enfold WordPress Theme by Kriesi
Steel Petrochemical
رفتن به بالا