Steel

Our Mission Is To Provide Process Automation And Control Systems For The Metals Industries, Whether You Are In The Design, Build, Run Or Optimize Phase Of Your Plant, FTECO Can Help You Determine The Best Investments With The Most Profitable Return Using Standard Methodologies, We Can Help You Define The Scope Of Any Project, Whether It Is An Upgrade To Your Production Line Or An Entire New Plant. Our Engineers Can Design What You Want, Or Be There To Advise Or Supplement Your In-House Staffs.

Machine Positioning of No. 3 coke Plant of Esfahan Steel Company

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Machine Positioning of No. 3 coke Plant in TAVAZON Project of ESCO including:
- Coke Pusher Machine
- Quenching Machine
- Transfer Machine
- Charging Car
based on S7-400H Siemens PLCs & PCS7 software (Approx. I/O No.: 1200, Capacity: 900,000 ton/year)
Duration: 2 Years
Starting Year: 2014
Location: Esfahan
 

100%



Modernization of Galvanized Coil and Sheet unit of Amirkabir Steel Co.

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System for SSL unit of Amirkabir Steel Co.
Duration: 6 Months
Starting Year: 2016
Location: Kashan, Esfahan
 

100%



Modernization of Material Storage, Stacker & Reclaimer of Esfahan Steel Co

EPC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Modernization and Expansion of Raw Material Storage and Stacker & Reclaimer Machines of ESCO, one of the biggest in the middle east material handling project
Duration: 3 Years
Starting Year: 2011
Location: Esfahan
 

100%



Raw Material Handling of ESCO

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Control System (EIA) for Raw Material Handling of Esfahan Steel Company.
Duration: 3 Years
Starting Year: 2011
Location: Esfahan
 

100%



Melt Shop Plant of ESCO

E Basis
Project Description:
Upgrading and modifying Software from PCS7 Version 5.2 to PCS7 Version 7.1 .
Duration: 18 months
Starting Year: 2012
Location: Esfahan
 

100%



Low hydrogen annealing of Mobarakeh Steel Company

EC Basis
Project Description:
Design, Procurement, Developing of Control & Monitoring System Software, Installation and Commissioning of Low hydrogen annealing of Mobarakeh Steel Company based on Siemens PLCs & PCS7 software *(Approx. I/O No.: 2000)
Duration: 18 Months
Starting Year: 2015
Location: Esfahan
 

100%



Heat Up Procedure of No.1 Battery in Esfahan Steel Company

EC Basis
Project Description:
Design & Developing of Monitoring System Software for Heat Up Procedure of No.1 Battery in ESCO, based on ADAM Modules & WINCC HMI software (Approx. Thermocouple No.: 400)
Duration: 6 Months
Starting Year: 2014
Location: Esfahan
 

100%